SPECIALIST FIELD GUIDE / 6 MIN READ
Price and deliver a planting project with a clear record
From named beds and reviewed selections to procurement, installation scope and care handoff.

View the planning illustration
Original Booked Work Pro business guidance · October 20, 2026. Examples are fictional. Technical site decisions and actual agreements require the appropriate review.
Define the bed before counting plants
A planting estimate starts with a named work area. Give each bed a reference, record measured dimensions and identify what remains. A photo can support a conversation, but it cannot establish the hidden site conditions or the exact boundary of paid work. Record who measured, when they measured and which quantities still need checking. If the customer says “refresh the front,” turn that into a list of areas and decisions rather than an unlimited promise. Keep the customer’s objective alongside the scope: appearance, reduced upkeep or a different use of space can lead to different choices. A clear brief lets the estimator explain what the price actually covers.
Keep the selection schedule separate from the mood board
For each reviewed selection, record the plant reference, approved specification, quantity, supplier status and decision owner. A customer’s inspiration image is not a procurement schedule. Where a choice is unresolved, label it as pending or explain the allowance and its basis in your actual proposal. Do not quietly substitute a different size or selection because stock changes. Establish who reviews suitability, what information they need and how the customer sees a proposed substitution. This guide organizes the business record; plant suitability, soil conditions, spacing and establishment requirements remain with the qualified person reviewing the actual site.
Break the work into cost-bearing phases
List agreed removal, protection, preparation, delivery, handling, planting, specified surface material, cleanup and handoff. Then estimate person-hours and direct costs for those phases. Loading, staging and moving materials can consume real time even when the bed itself is small. Do not multiply by crew size twice: two people working eight elapsed hours use sixteen person-hours. Keep equipment, disposal, delivery and allocated overhead visible. If a supplier’s price excludes transport or a return trip, the quote is not yet a complete job cost. Record uncertainty as an open question or a defined allowance instead of hiding it in an optimistic labor number.
Convert quantities before comparing supplier offers
Use a consistent measured area and a depth selected through the project specification. Volume in cubic feet equals square feet multiplied by depth in inches divided by twelve. Divide cubic feet by twenty-seven for cubic yards. An additional ordering allowance is a separate assumption, not permission to change the installation. The material calculator compares bulk and bag pricing using the supplier increments you enter. Ask what is included in delivery, whether there is a minimum and what the product’s labeled yield means for this work. Weight, compaction and suitability are separate questions the volume conversion does not answer.
Keep options understandable
An option should describe a specific change to the base scope. State the added or removed work, its customer price and whether accepting it affects timing or another selection. A larger plant option can alter handling and availability as well as purchase cost. In the estimate builder, leave unselected options outside the base subtotal and tax. Select an option only when preparing the corresponding reviewed estimate version. Keep a copy of the earlier version so both parties can identify the change. The tool records the current selection in your document; it does not capture approval or authorize a crew to proceed.
Plan procurement around actual decisions
Create a simple readiness list: current scope reference, reviewed schedule, selections confirmed, supplier availability checked, delivery arrangement, staging permission and open questions assigned. A target installation date should stay a target until the dependencies are reviewed. When material becomes unavailable, record the proposed alternative and the consequence before buying it. Keep any supplier confirmation with the project file through your normal process. A purchase order, a customer estimate and a crew instruction serve different purposes; make sure they refer to the same revision rather than assuming the newest email contains every decision.
Close with the installed record
At handoff, compare the completed work with the current scope and accepted changes. Record what was actually installed, relevant product documents, unfinished items and who owns each next action. Provide care information from the appropriate professional or supplier for the actual installation. Avoid a universal watering schedule copied into every job. Ask the customer to identify questions and record what was discussed. A photograph of a finished bed is useful evidence of appearance, but it does not by itself close an open item or prove a maintenance obligation was explained. Keep the final records easy to retrieve.
Review the estimate against the outcome
After the work, compare estimated and actual person-hours, delivery costs, disposal and any substituted purchases. Separate a scope change from an estimating error: they require different corrections. If access took twice as long as expected, note the measurable reason so the next site visit catches it. Review whether the customer understood options, exclusions and the next step. Keep project notes focused on business facts rather than personal judgments. The goal is a better next estimate with clearer assumptions. Retain records according to your own business process and avoid putting private customer details into public project captions.
Build a procurement cross-check
Before ordering, reconcile three lists: the selections the customer reviewed, the quantities in the estimate and the instructions the crew will receive. Give each line a stable reference so a supplier substitution can be traced without rewriting the entire project from memory. Record confirmed availability separately from a request for availability. If only part of the order is ready, review whether delivery and installation should remain together or whether another handling cost is created. Check that the person placing the order has the current revision. A simple reconciliation can reveal a duplicated plant line, a missing delivery charge or an allowance that was mistaken for a final choice. Resolve that discrepancy with the responsible reviewer before purchasing. The record should make it possible to explain why the final order differs from the original idea.
Make the care handoff retrievable
Create a handoff index with the installed selection reference, the source of care information, the person who explained it and any question requiring follow-up. Keep the source document itself through your normal record process; a short note saying “care supplied” may not tell the next person what the customer received. Separate establishment questions from a claim about installation quality, and avoid deciding the cause of a problem from a single photograph. Record the observation, date and requested next action. If a follow-up visit is proposed, distinguish that proposal from a confirmed appointment. Tell the customer which contact route to use and what information would help the responsible professional review the question. This produces a useful service record without inventing a universal care schedule or warranty promise.
Run a scope-change rehearsal
Before presenting the estimate, ask what would happen if the customer requested four more plants after the supplier order was placed. Identify the new selection review, extra material, extra person-hours, supplier change, timing effect and customer price. Then identify the real decision record that must exist before the crew follows the new instruction. In the Willow Court arithmetic example, the extra cost is $180 and the customer price is $240 at a 25% target margin. Those numbers explain the calculation; they do not establish what another property should cost. Save the base estimate and revised estimate separately. Check that the later invoice includes the selected change once and that a payment receipt subtracts only money actually received. The rehearsal tests whether your records remain coherent when the project stops following its original plan.
Take this checklist to the next job.
- Named work areas and retained features recorded
- Measurements and selection review assigned
- Removal, preparation, handling and handoff costed
- Supplier units, increments and delivery checked
- Base work and options clearly separated
- Current version and actual decision reference retained
- Installed selections, open items and care sources handed over
CSV opens in spreadsheet software. Fill the blank project-record column and save your own copy. Your entries are not uploaded.